Bedding is measured in tons, while joint fill is sold by the bag. Treat them as separate sand needs.

Enter your project dimensions

ft
Enter a length greater than 0
ft
Enter a width greater than 0
ft
Enter a diameter greater than 0
in
Enter a depth between 0.25 and 24 inches

On a 300-square-foot patio, the bedding calls for about 1.25 tons, but the joints need only 4-8 bags. These materials do different work despite sharing the same name. Below, the calculator measures a 1 inch coarse-sand bedding layer using 1.35 tons per cubic yard. The chart that follows covers the joints, including polymeric sand coverage for each 50 lb bag.

Two separate calculations

  1. Start with the paved area plus the base's 6-inch overhang, and use exactly 1 inch for bedding. A thicker layer can let pavers shift later.
  2. Figure joint fill by bag, not tonnage. For standard 1/8 to 1/4 inch joints, one 50 lb bag covers 40-75 square feet.
Bedding tons = (Area sq ft × 1 ÷ 12) ÷ 27 × 1.35
Joint bags (50 lb) ≈ Area ÷ 40-75 for standard joints

Bagged joint sand

Patio sizeStandard joints (1/8-1/4")Wide joints (3/8"+)
100 sq ft2-3 bags4-5 bags
200 sq ft3-5 bags7-10 bags
300 sq ft4-8 bags10-15 bags
500 sq ft7-13 bags17-25 bags

Joint width and paver thickness affect coverage, so follow the bag label and buy enough to round upward. Save some joint sand for the first wash-in, since the joints may settle a quarter inch.

Bedding rules for the wheelbarrow

  • Set up pipes or rails, screed the bedding to one inch, and refill the resulting channels as pavers are placed.
  • Use only coarse, angular sand rated for masonry or concrete work. Play sand is rounded, so it can move under load beneath pavers and within the joints.
  • Keep bedding sand uncompacted until the pavers are set. Then compact the finished surface to seat the pavers in the bedding.
  • Keep off the screeded layer. Work forward while standing on pavers already set.
  • Compared with sand, screenings make a firmer bed and give less room for leveling adjustments. Stay with one material over the full surface.

Plain or polymeric joint sand

After it is wetted, polymeric sand firms up and helps keep weeds, ants and rain from working through the joints. It costs several times more per bag, has to be applied bone dry, and one mist at the wrong time can ruin the full sweep. Fine mason sand is inexpensive, quick to sweep in, and needs replenishing every season or two. Use polymeric for driveways, sloped pavers and high-traffic areas; mason sand suits a level garden path. Under the pavers, use plain coarse sand in either case. Polymeric sand is only for joints.

The joint re-sanding interval

Rain, ants and leaf blowers gradually remove joint sand. Plan to add plain mason sand every year or two, while polymeric can hold 5-10 years before joint edges begin to separate. Work on a dry day: sweep in the sand, compact it, then mist it. Use a low leaf-blower setting near filled joints, since Wyoming wind and a strong nozzle can carry sand away.

Example: a 20 x 15 patio

Allow about 320 square feet after including the overhang. Bedding at 1 inch requires 27 cubic feet, equal to 1 cubic yard or 1.35 tons. Purchase 1.5 tons of mason sand. For 300 square feet of standard joints, estimate 4-8 bags of polymeric or 2-3 bags of mason sand. Both layers sit over 4-plus tons of crusher run, with the amount sized using the Paver Base Calculator. Keep the site sand pile under a tarp: damp-to-dry sand screeds cleanly, but soaked sand does not.

Sorting bedding and joint sand

How do I figure the amount of paver sand needed?
Calculate bedding by multiplying area by a 1 inch depth in feet, dividing by 27, and multiplying by 1.35. That equals 0.42 tons per 100 square feet. Buy joint sand in bags, allowing one 50 lb bag for 40-75 square feet of standard joints.
What coverage comes from a 50 lb bag of polymeric sand?
For standard-thickness pavers with narrow 1/8 to 1/4 inch joints, expect Forty to 75 square feet from a bag. Coverage may be cut in half with wide joints or 3-inch pavers, so use the coverage chart printed by the brand. Order one bag beyond the calculated amount.
Are 2 inches of sand excessive beneath pavers?
Yes. Screed bedding at 1 inch. A layer twice that deep may seem helpful, but it can shift and leave pavers low or unsteady. Put added depth in the stone base rather than the sand.
What does 1 yard of paver sand weigh?
Dry coarse sand weighs about 2,700 lb per yard, or 1.35 tons. At the 1-inch bedding depth, a yard covers about 320 square feet.
What should I do if ordinary sand washes from the joints?
Water moving over the patio commonly causes ongoing joint-sand loss, so first check the slope and downspouts. Once dry sand has been swept back in and compacted, seal the surface or use polymeric sand.
Does paver sand equal play sand?
No. Coarse angular particles are needed for bedding because they interlock. Fine, round play sand can roll, leave joints, and allow pavers to shift. The shared word "sand" is about all they have in common for this work.

One ton of bedding instead of 25 bags.

Free delivery is available for mason and washed sand; reserve bags for the polymeric joint sweep.