Crusher run calculator for Wyoming
A pavement-firm base layer sized for its final compacted thickness, not its loose depth.
Enter your project dimensions
Loose crusher run settles 10-15% when compacted. If you buy only to the measured depth, the finished base can end up half an inch shallow, so this calculator begins with its +10% allowance enabled. It may be called Pit Run, bank run, pit gravel in Wyoming, or 2 inch minus on tickets. Each name refers to crushed stone containing fines, about 3,000 lb per cubic yard, which compacts into a surface that resists tire movement.
Order for finished depth
- In feet, record the footprint: multiply lane length and width, or enter the pad size.
- Enter the required compacted depth: 4 inches for paths and pavers, 4-6 for driveways, and 6-8 beneath trucks.
- Divide cubic feet by 27 for yards, then multiply by 1.5 to get tons. Keep the +10% selected. Depth specifications apply after rolling.
Tons of coverage
| Compacted depth | 1 cubic yard covers | 1 ton covers |
|---|---|---|
| 2 inches | 162 sq ft | ≈ 108 sq ft |
| 4 inches | 81 sq ft | ≈ 54 sq ft |
| 6 inches | 54 sq ft | ≈ 36 sq ft |
| 8 inches | 41 sq ft | ≈ 27 sq ft |
Suitable uses and limits
- Driveway bases need 4-6 inches after compaction, followed by 2-3 inches of #57 or driveway gravel as the travel surface.
- For economical rural lanes, crusher run can form the driving surface. Plan on dust during summer and regrading at 2-4 year intervals.
- Paver and slab bases use 4 inches, compacted in 2-inch lifts. The Paver Base Calculator covers the complete paver assembly.
- Shed and hot-tub pads require 4 inches over stripped ground, or 6 on soft soil.
- Keep it out of a French drain. The same fines that create a tight bond retain water, while clean #57 or drain rock allows drainage.
Example: a 20 x 10 parking pad
At 4 inches after compaction, Two hundred square feet calculates as 200 x 0.333 = 67 cubic feet = 2.5 cubic yards, or 3.7 tons. Order 4 tons to include the allowance. Place half the material and compact it, then place the remainder and compact a second time. Two 2-inch lifts hold up for years longer than one 4-inch pour, especially where spring melt tests a base. Renting a plate compactor for the afternoon is less costly than repairing the first pothole. By the second delivery, ruts can reveal where compaction was skipped.
Delivery guidance
- Have base and surface stone delivered together to keep the work moving. Delivery is free either way.
- Put the load at the distant end of the run, then work back toward the pile. On large pads, spreading downhill saves a full day over uphill work.
- Lightly mist every lift before rolling it. Damp crusher run compacts more tightly than dry material.
- Reserve a wheelbarrow-load for later touch-ups, since potholes can develop.
Pricing information
Crusher run is produced during crushing rather than being washed and sorted. On a 4-ton order, the +10% allowance can prevent the need for a second half-ton delivery. Review the Crusher Run product page for the per-ton price, compare Road Base, and order both driveway layers in one free delivery.
Crusher run, Pit Run, bank run, and pit gravel questions
How much crusher run is required for a driveway?
What does a yard of crusher run weigh?
How are crusher run and gravel different?
Are crush and run and crusher run the same?
Can crusher run be used as a finished surface?
How much will crusher run shrink?